Stormwater management for the Gerrie Road condominiums in Elora involved subsurface detention of runoff to provide quantity control. The subsurface detention system was constructed using rigid [...]
This project required significant stormwater management control as part of the expansion of an industrial facility in Kitchener. A subsurface detention tank was constructed beneath the parking [...]
This project involved the design of a stormwater management system for a contributing area of approximately 32hectares. The strategy involved a “treatment train” approach that included lot level [...]
The Bird Landing Subdivision is a large residential subdivision (+/- 6.0 ha) which included mixed-density residential lots and municipal right of ways. The stormwater management design included [...]